An inductive/reactive load bank is intended to be used in conjunction with a resistive load bank to test a generator or power source at 0.8 power factor (lagging). To achieve a 0.8 power factor, the reactive load bank should be sized at 75% of the resistive load bank kW rating. The resistive and reactive load banks are connected and operated in parallel. Is available in balanced 3-phase loads of 150, 188, 191, 225, 228, 300 and 375 kVAR at 240 or 480 volts. These units are available with different size load steps, depending on customer requirements. The typical load steps are 3.75, 7.5, 9.38, 18.8, and 37.5 kVAR. An optional, continuously variable, 0-3.75 kVAR load adjustment is available.